Harbor Point Sewage Force Main and Pumping Station
Excavation, structures and pipeline for 2.1 MGD underground sewage pumping station
Design-build, site-specific braced sheetpile shoring system
Design-build dewatering system with on-site decontamination for TPH and chrome
Installation of pre-cast concrete wet well and pump vault structures
Water, storm and electric utilities for new pump station control building
Design-build 1,000 LF 8-inch HDPE force main discharge piping, with 800 LF installed by horizontal directional drilling (HDD) method to minimize time, noise and traffic disruption
Multiple crossings of existing critical utilities
Connection to active City trunk main with internal rehabilitation of trunk main manhole
Developed minimally invasive traffic control plan and obtained City permits