Natural Gas Featured Projects

Horseshoe Casino BGE Gas Relocation

  • Installation of a natural gas pipeline extending around a new casino site covering three city blocks in downtown Baltimore
  • 1,400 LF of 24” coated steel pipe with welded and wrapped joints
  • Deep, open-cut trenches in city streets
  • Managed contaminated ground water conditions
  • Excavation around and support of numerous existing city trunk utilities with hand tunneling underneath large storm drain box culverts
  • Managed City permitting and development of a complex traffic control plan for major thoroughfare
  • Phased construction coordinating with two nearby professional sports stadiums and adjacent casino construction activities

Severn River Bridge Gas Crossing

  • 2,900′ of 8″ welded steel high pressure gas main pipeline with 9 expansion loops
  • Fabrication, installation and painting of 172 structural steel diaphragm supports, drilled and bolted into existing bridge girders
  • Innovative scaffolding system provided safe access to all work points and zero impact to bridge traffic
  • 100% x-ray and field coating of pipe joints and 450 psi hydrostatic pipe testing
  • 6,000’ of 8” HDPE high pressure gas main pipeline on both sides of bridge with service renewals to 28 residents
  • Featured in the publication, BGE Now: https://www.bgenow.com/2021/03/11/severn-river-bridge-gas-main-project-is-something-incredible-being-built/